Lakelands Secondary College (500kW)
Lakelands Secondary College is part of the first-ever WA Schools Public Private Partnership, which will see eight public schools designed, built, financed and maintained for up to 31 years by project company EduWest.
A public secondary school with capacity for more than 1500 students, plus places for up to 84 students with disabilities and high needs, Lakelands Secondary College will be equipped with the most up-to-date learning technology and permanent facilities.
Solar Naturally won the sub-tender to complete the solar works for EduWest, with solar an integral part of EduWest’s proposal. We were required to design a system that would meet a minimum generation amount, and proposed a 5ookW system comprised of over 1,724 Solar Panels.
At 500kW panel capacity and 410kW inverter capacity, Lakelands Secondary College’s solar PV system is one of the largest rooftop installations on the entire Western Power Network, generating enough electricity to power 125 homes.
Lakelands Secondary College Stage 1 will begin taking students in 2019 and Stage 2 in 2022.
Solar Naturally also has the tenders to commission other state schools in the same project: Harrisdale Secondary School (480kW) and Hammond Park Secondary School (500kW).
Considering a commercial scale solar project? Contact us today and we can begin to build your system together!
Company | Lakelands Secondary College |
Location | Lakelands |
Industry | Education |
Solution | 1,724 x 290W Solarworld Tier 1 Solar Panels 20 x German SMA Inverters of varying sizes |
CO2 Annual Carbon Reduction | 743 tons |
CO2 Equivalent Reduction | 2,761 trees planted per year |